Helical Anchors Inc.
All products

Tiebacks

Horizontal tieback anchors and retaining wall anchors for sheet piles, shoring and slope stabilization — removable and permanent configurations.

Engineered, manufactured & galvanized in Minneapolis.

Helical tiebacks are tension elements installed at an angle through retaining walls, sheet piles and shoring to resist lateral earth pressure. They install in a single stage with the same equipment as our piles — no grout cure, no separate drilling spread.

From temporary construction shoring to permanent retaining wall anchors and slope stabilization, every tieback is torque-to-capacity verified during installation. A PTI-compliant grouted configuration is available for permanent applications in competent soils.

Helical tieback anchor installation for retaining wall and shoring support
Specifications
  • Removable & permanent designs
  • PTI-compliant grouted option
  • Single-stage installation
  • Torque-to-capacity verified
  • Hot-dip galvanized ASTM A123
  • Any wall connection detail

Built different. Built to last.

01
Single-stage install

The anchor is its own drill — install, tension and proof-test with the same drive head, with no separate grouting crew for most applications.

02
Verified capacity in place

Installation torque correlates directly to pull-out capacity, so every tieback is proof-tested as it's installed.

03
Removable for temporary works

Shoring and excavation support tiebacks back out cleanly when the job is done — no abandoned anchors in the ground.

04
Any termination detail

Waler plates, threadbar adapters and custom weldments fabricated in-house to match your wall system.

Where tiebacks go to work.

Retaining wall anchors
Sheet pile & shoring tiebacks
Slope stabilization
Excavation support
Seawall & marine bulkheads
Temporary construction shoring
Explore all applications

More from the catalog.

Need tiebacks for your project?

Send us your soil report and structural loads. Our engineers will recommend shaft size, helix configuration, install method and torque target — within one business day.